Construction method of self-adhesive glass fiber grid

Feb 18, 2020

Leave a message

1. Preparations:

Complete all joints, pit repairs, foundation reinforcements and screeds.

2. Road table status

The pavement must be clean, dust-free, dry, and between 5 ° C and 60 ° C.

3. Product preparation

Self-adhesive glass fiber geogrids must not be stored in a dry environment at the construction site to maintain stickiness.

4. Laying method

(1) Mechanical laying

Install the entire roll of fiberglass grid on the unwinding rack in front of the tractor, paying attention to the sticky side facing down. Make the tractor go forward, make sure the glass fiber grille sticks to the road straight, and use a light roller with rubber wheels to roll it 1-2 times. Paving asphalt mixture pavement.

(2) Manual laying

Place the entire roll of fiberglass grille behind the truck or trolley unloading rack with the sticky side facing down. Make sure that the unwinding shaft is locked so that the cloth roll does not loosen freely. When the truck (or trolley) is slowly moving forward, step on one end of the grille. If the grille is loose, adjust it immediately to prevent wrinkles. Use a light roller with a rubber roller to roll it 1-2 times, activate the grid adhesive to spread it on the asphalt pavement.