Production Process Of Steel Plastic Geogrid

Jan 15, 2020

Leave a message

The production process of the steel-plastic geogrid is not complicated. The steel wire is mounted on the wire (the spring wire is used for the steel wire). The holes enter the extruder head. The number of steel wires is determined by the model produced. The plastic raw material feed hopper is heated and the extruder reaches a certain level. Turn on the machine after the temperature, pull out the steel-plastic composite geotechnical belt, enter the cooling water tank, and embossing roller (the purpose is to increase the friction between the finished product and the sand or gravel or soil, which can be better combined with it to improve the overall reinforcement effect. To increase the stability of the foundation, the steel-plastic composite geotechnical belt is plated into the welding equipment, and then the formed steel-plastic grid is output at one end of the roll.

Shandong Lianyi Engineering Plastics Co., Ltd., with diversified products and excellent services, is in line with the business model of "sincere and sincere, Lianyi Kyushu" to solve your needs. Welcome to visit our company.