HDPE geomembrane construction technology and precautions

Nov 02, 2020

Leave a message

  1. Design plan

    (1) Base layer design

    (2) Protective layer design

    (3) Slope protection design

    (4) Anchoring design

  2. Key points for construction of HDPE geomembrane

    (1) Preparation before construction

    (2) Laying of HDPE Geomembrane and Protective Layer

    (3) Joint Welding and Testing of Geomembrane

         a. Experimental welding   b.Productive welding   c.Weld inspection

    (4) Construction Precautions

         a. Decoupling slip   b.Disengage at the joint   c.Pull cracked


QQ20201102151339